Bridges

Capital House Australasia provides optimised engineering solutions for all forms of bridges including rail, traffic and pedestrian.

Capital House has extensive experience in bridge design and understands the importance of both aesthetics and minimising the ongoing maintenance requirements.

We also have experience in undertaking assessments, strengthening and upgrade works for existing bridges, be it timber, concrete or steel, to maximise the working life of the asset.

Pre-engineered solutions for short span pedestrian bridges have been developed and patented using FRP composites, which can be rapidly procured, require zero maintenance and can often be installed in less than 4 hours.

  • Construction of Kings Park Bridge Perth (Lotterywest Federation Walkway) 1m01s

  • Lotterywest Federation Walkway Kings Park

  • Traffic Underpass Railway Bridge: Sequence of Construction - 0m39s

  • Karrakatta Road Underpass Fremantle Line

  • Gosnells Centennial Pioneer Park

  • Mini Bridges - Tweed Trail - FRP Composite Bridges

  • Matrade Building

  • Flat Pack Bridges
    (Patented Design)

  • Flat Pack Bridges - 1m01s

  • Mini Bridges
    (Patented Design)

  • Mini Bridges - 0m37s

  • Albany Footbridge

  • Heirisson Island Footbridge

  • MRWA Bridges Refurbishment

  • Jarrahdale Aerial Walkway

  • Vierendeel Truss Bridge